SOP For Moisture Analyzer

  • Home
  • SOP For Moisture Analyzer

SOP For Moisture Analyzer

Aim: To lay down the standard operating procedure for operating a moisture analyzer

Objective: To establish the standard operating procedure for operating a moisture analyzer at the facility

Responsibility:  The user department is responsible for implementing the SOP

Operating Procedure:

  • First ensure the moisture analyzer is cleaned state
  • Switch on the power supply to the moisture analyzer
  • Ensure the air bubble is the level indicator at the center
  • Press the power button on the moisture analyzer and the display shows 000
  • Now place the aluminum dish and tare it by pressing tare button
  • Now put the required quantity of sample by spreading uniformly on the aluminum dish
  • Now set the temperature according to the product specification
  • Press the start button and wait until the beep sound is observed
  • Beep sound indicates end of drying and percent LOD will be displayed

Cleaning Procedure:

  • Open the lid of the moisture analyzer and remove the aluminum dish
  • Take out the dish holder from the moisture analyzer and clean it
  • Using a brush clean all the inside surface of the moisture analyzer and outside surface with lint free cloth

Note: This is a generalized procedure, and it varies according to the model and maker of the moisture analyzer

Submit a Comment

Your email address will not be published. Required fields are marked *


The reCAPTCHA verification period has expired. Please reload the page.

Hello
Chat now via Whatsapp