GMP Audit Check List- Weighing and Dispensing

GMP Audit Checklist – Weighing & Dispensing
1. Area & Environment
-
Weighing/dispensing area dedicated, controlled, and clearly labeled.
-
Differential pressure maintained between adjacent areas.
-
Environmental conditions (temperature, humidity, cleanliness) monitored.
-
Cleanliness of area maintained before and after each activity.
-
Access restricted to authorized personnel.
2. Equipment & Balances
-
Balances calibrated and within valid calibration period.
-
Balance verification performed daily/ before use.
-
Equipment cleaned before and after use; cleaning records maintained.
-
Use of dedicated scoops, spatulas, and containers.
-
Equipment ID labels available (Cleaned/In-use/To be cleaned).
3. Materials
-
Raw materials received with proper status labels (Quarantine/Approved/Rejected).
-
Materials transferred to dispensing area with proper authorization.
-
Containers properly cleaned, intact, and sealed before dispensing.
-
Materials stored under defined conditions.
-
Material identification verified against batch manufacturing record (BMR).
4. Dispensing Process
-
Dispensing performed as per approved SOP and BMR.
-
Personnel trained and qualified for weighing/dispensing activity.
-
Two-person verification followed (one performs, one checks).
-
Line clearance obtained before starting dispensing.
-
Use of clean, labeled, and dedicated containers/bags for dispensed material.
-
Cross-contamination controls in place (segregation, unidirectional flow).
5. Documentation
-
Material requisition and dispensing records available.
-
All weighing entries recorded in logbook/BMR with signatures.
-
Corrections made as per ALCOA+ principles.
-
Labels on dispensed material include:
-
Material name
-
Batch/lot number
-
Quantity dispensed
-
Date & signature of operator/checker
-
-
Reconciliation performed for issued vs. dispensed quantities.
6. Controls & Compliance
-
Use of barcode/RFID systems (if applicable) for traceability.
-
SOPs available for weighing, dispensing, cleaning, and operation of balances.
-
Deviations, OOS, or discrepancies reported and investigated.
-
Access control for weighing area (e.g., airlocks, restricted entry).
-
No expired/rejected materials present in the area.
7. Safety
-
PPE worn by all personnel (gloves, masks, gowns, goggles).
-
Dust extraction/containment system functioning properly.
-
Spill control procedure in place.
-
Material safety data sheets (MSDS) available in dispensing area.
✅ Key Audit Focus Points:
-
Observe gowning and hygiene of personnel.
-
Check calibration and use of balances.
-
Verify reconciliation and traceability of dispensed material.
-
Ensure segregation and contamination control during dispensing.
🎓 Discover one of the best Complete Pharmaceutical Quality Assurance Course available —click below to explore the course that’s shaping future in QA Course skills.